Design, engineering, supply, erection, testing and commissioning of 100MVA, 220KV/11KV Air Insulated Substation (AIS) for a 72MW Utility project. Multi-level voltage transformation infrastructure supporting large-scale power distribution.
Design, engineering, supply, erection, testing and commissioning of 100MVA, 220KV/11KV Air Insulated Substation (AIS) for a 72MW Utility project. Multi-level voltage transformation infrastructure supporting large-scale power distribution.